3 Thayer Street, Quincy, MA

Development: 3 Thayer Street

Address: 3 Thayer Street, Quincy, MA

Neighborhood: Quincy Center

Units: 8

Year Built: Est 2027

Building Use(s): Residential Condo

BPD has held the property at 3 Thayer Street within it’s rental portfolio since 2016. Located on the same street as BPD’s previous Hillside and Brookside developments, the acquisition was a strategic decision to support the long-term development plans of the organization.

Over the past year, the BPD team has worked closely with the City of Quincy Planning and Zoning departments to obtain approvals to raze the existing structure and allow for the construction of an 8-unit condominium development, which includes 12 on grade parking spaces and a podium structure above. The units will be an equal mix of 2 and 2+ Bedrooms and will feature open living, full height windows, private balconies and designer finishes.

Construction is currently underway with sellouts occurring in 2027.

View Project

7 Wellington Street, Boston, MA

Development: 7 Wellington Street

Address: 7 Wellington Street, Boston, MA

Neighborhood: South End, Boston

Units: 2

Year Built: Under Construction - Est 2026 Completion

Building Use(s): Residential Condo

The property at 7 Wellington Street presented a rare opportunity to acquire a single-family brownstone residence within Boston’s South End Neighborhood. BPD acquired the property which was in serious disrepair in January 2025 and immediately began design and entitlement. The proposed development will subdivide the existing 5 floors into a Garden Level Duplex and Upper Triplex. The exterior of the building will be completely revamped with the repointing of existing masonry, repair of the historic cornice, replacement of all doors & windows and the reintroduction of the historic street stairs that were removed years prior. In addition, a roof deck is proposed for exclusive use by the top triplex.

Both units will feature spacious living areas, designer kitchens and high-end finishes. Completion is estimated for Q1 2026.

View Project